The Brief

Completed in early 2025, Inox Equip delivered £800k+ of new F&B areas at the new Becketwell Live arena in Derby. Constructed by Bowmer & Kirkland, in partnership with Derby CC, the F&B offer at the 5,500 capacity multi function arena is operated by ASM.

20250219_121242657_iOS
20250219_121300510_iOS
20250219_121222808_iOS
20250219_120547484_iOS
The result

A Large production kitchen, with an MKN and Rational Cookline, high capacity Meiko rack dishwasher, with separate reverse osmosis glass wash section, as well as dedicated raw and cooked Foster Coldstore cold and freezer rooms. The main kitchen also has it’s own roll-in blast chiller and large Jack-Stack coldroom to allow the kitchen to cater to large multi-course events.

2 food concessions with rear feed Flexeserve heated displays and flexible cookines, able to cater for multiple menu options.

2 bars and a central destination bar, with bottle coolers and gantries. The brushed stainless worktop with black powder coated frame work results in a hard-wearing commercial grade finish that looks great as a front of house bar. The 17 metre destination bar, houses front counter beer and soft drink delivery and the rear counter allows for speed pour beer with a pass-through section, as well as further Flexeserve hot display holding for a versatile hot food offer.

A dedicated crew kitchen to allow visiting acts to cater for production and entertainment staff. The room allowed for multiple service points to supply any cooking equipment the visiting catering teams bring with them.

VIP Kitchen and bar featuring it’s own coldstore, MKN and Rational cookline, Meiko dishwash section, hot and cold pass and a stills section for bulk brew coffee. This space allows the operator the flexibility to deliver to the muli-use conference space adjacent the kitchen and to the VIP balcony seating in the area simultaneously during events. The allows the operator to maximise their output during busy events and also cater for anything from small meetings to large conferences.

The project was delivered on time in collaboration with B&K and handed over on budget and with no additional costs.